Consolidation
One container. Multiple factories. Documented QC.
Tile, brass and joinery do not share a yard. Mixed loads fail when each supplier waves from the dock. Winwey holds the plan, the count and the photos.
- 01Allocation sketch
You send the mix — m², basins, vanities, port. We return factories, CBM and what still needs a sample.
- 02Lock the series
Finishes, formats and spare ratios are written once. Each plant works from the same list.
- 03In-plant checks
Shade, calibre, hardware and moisture are checked at source before anything moves to the yard.
- 04Yard consolidation
Drops arrive against the packing list. Piece counts, edge kits and labels are reconciled as one load.
- 05Pre-shipment proof
Photo set and packing list go to you while the container is still in Foshan. Then we seal.